Technology Energy Station Energy Industrial Materials Digital Science & IP Solutions Products Investors
GPC Energy Station
400 kVA IN.
3,200 kVA OUT.
8 VEHICLES AT ONCE.

No substation upgrade. No new transformer. No grid proportionality problem. GPC Energy Station delivers up to 3,200 kVA of simultaneous EV charging throughput from a fixed 400 kVA grid connection — using temporal power multiplexing.

400
kVA GRID INPUT
3,200
kVA OUTPUT
8
SIMULTANEOUS EVs
6
BESS UNITS
0
GRID UPGRADES
The Problem
The grid proportionality trap
CONVENTIONAL CHARGING

More vehicles = more grid demand. Proportionality cannot be broken — only shifted in time.

Substation upgrade costs more than the chargers. Permitting takes longer than construction.

6 BESS units alone cost less than one transformer upgrade — yet conventional systems still need both.

GPC ENERGY STATION

Temporal power multiplexing breaks the proportionality. Grid draw stays at 100 kVA regardless of how many vehicles charge simultaneously.

Same 400 kVA commercial grid connection already at most sites. No substation negotiation, no feeder upgrade.

Fits the footprint of a conventional petrol station. Repurpose existing sites — no greenfield construction required.

How It Works
Temporal Power Multiplexing

The battery integrates the pulse sequence and perceives a continuous 400 kVA charge. The grid sees only 100 kVA at any instant. Both are correct — because energy and power are not the same thing.

STEP 1
4 Power Sources Per Pump

Each GPPump contains 4 × 100 kVA power sources. 3 draw from BESS units, 1 draws from the grid. Maximum output per pump: 400 kVA.

STEP 2
Round-Robin Sequencing

GPC Distributor activates sources in strict rotation. At any instant, only one 100 kVA source is active per pump. The grid never sees more than 100 kVA total draw.

STEP 3
Battery Integration

EV battery's time constant (τ = C×r) is large relative to sequencing period T. Battery integrates pulsed input — perceives 400 kVA continuous delivery.

GRID SEES
100 kVA
instantaneous draw
VEHICLE RECEIVES
400 kVA
effective throughput
Station Architecture
Three layers. One connection.
BELOW GRADE
6 × BESS Units

Underground, where petrol tanks used to be. Each BESS independently manageable. SOC, temperature, discharge current reported to GPC Distributor in real time. Recharged overnight on the same 400 kVA connection in ~1.4 hours.

AT GRADE
8 × GPPump Units

Dispenser units at vehicle positions — physically analogous to petrol pumps. Each GPPump: 4 × 100 kVA power sources. Supports GPC pattern delivery to compatible vehicles for electrochemically optimized charging.

CONTROL LAYER
GPC Distributor

32-channel control system — one channel per power source across all 8 GPPumps. Handles temporal sequencing, SOC-aware scheduling, GPC pattern generation, and safety management simultaneously.

Software Layer
GP Energy Distribution

The control intelligence behind the GPC Energy Station. GP Energy Dist manages multi-source coordination, BESS scheduling, GPC pattern delivery, and real-time grid optimization from a single interface.

GP Energy Distribution Software
MULTI-SOURCE COORDINATION

32-channel simultaneous management across 8 GPPumps. Each power source assigned an independent GPC pattern and temporal slot.

AI PATTERN SUGGESTION

Analyzes vehicle chemistry and session parameters — recommends optimal GPC pattern in real time.

BESS-AWARE SCHEDULING

Continuous SOC monitoring across all 6 BESS units. Automatic priority adjustment to balance discharge and prevent bottlenecks.

GRID & CARBON ANALYTICS

Real-time grid savings, CO₂ reduction vs CC/CV baseline, energy efficiency per session. Full export to PDF and CSV.

GigaPulse Ecosystem
Where Energy Station fits

The 8-Layer GPC Energy OS — each layer is a distinct GPC application. Energy Station operates at layers 5 through 8.

LAYERS 1–4
Cell & Pack

Formation · First Charge · Battery Optimization · BESS Stability

LAYER 5
Mega Charge

Ultra-fast single-vehicle charging. GPC pattern delivery at 400 kVA per GPPump.

LAYERS 6–7
GPC Distributor

Multi-source temporal coordination. 32-channel BESS and grid management.

LAYER 8
Grid & Renewable

Direct renewable feed to BESS. Grid-independent overnight recharge. Carbon-zero operation.

Ready to deploy?

GPC Energy Station deployment planning, site assessment, and partnership inquiries handled directly.